SEU

SEU

WHAT THEY ARE AND HOW THEY ARE REGULATED

The plant typology called "Eciente system of Users" was introduced by Legislative Decree 115/08 S.M.I. establishing the obligation for the authority to denire the operative modalities for the related regulation.

After three public consultation procedures (DCO 33/11, DCO 183/2013/E/eel, DCO 209/2013/R/Eel), in December 2013 the decision was issued on 12 December 2013 578/2013/R/EEL-Annex A, bearing "Integrated text of the provisions Of the authority for electricity and Gas for the regulation of simple production and Consumption systems "(hereinafter TISSPC), with which the related services of connection, measurement, transmission, distribution, dispatching and sale have been normed.
The authority, in particular, has included the HUS within the simple production and consumption systems (hereinafter SSPC), as can be seen from the Gura schematized below

BOOK AN APPOINTMENT

We are looking for companies that want to enjoy the benefits of photovoltaics without diverting their attention from their business and above all without draining financial resources from core business activities.

01

PROPOSAL

  • Photovoltaic system at our expense


  • -30% discount on the energy consumed by your company

02

BENEFITS

  • no management charge for the company
       
  • 30% discount on energy consumed
       
  • possibility of acquiring the plant at cost 0 after 12 years, or earlier at cost
       
  • total remission of duties and charges for the management of electricity supply and regulatory updates
       
  • services related to ESCOs at advantageous conditions

03

SERVICE SPECIFICATIONS

  • 12 year period of activity, with the possibility of choosing between zero cost redemption of the plant built at the end of the period of management or restoration of the superficial coverage at the initial conditions
       
  • Possibility of early redemption, starting from the sixth year, referred to the cost of construction of the plant (initially defined) and not to the market selling price
       
  • Free loan concession for coverage areas for the management period
       
  • Construction, maintenance and management completely at the expense of the UNESCO
Share by: